Meadville Forging JBM Mill Foundation
Meadville Forging Company
| Meadville, PA
Overview
This successful Mill foundation required unisorb vibration control. Porter and design engineers spread the base concrete bearing capacity to maintain the allowable soil pressure to prove this project well. Porter installed water stop and smooth perimeter wall and base sub-pours to get the maximum vibration control of the unisorb membrane. After the Mill was set in place, nonshrinkable grout was installed at recessed anchor bolts.